It survived the flip, and landed on its feet. To be fair I wasn't just going to throw it over this was to be done carefully, but there was still room for concern, and possible catastrophic failure. With failure adverted however I could now install the desk, and start the process of gearing it up. As I said earlier a lot of space was needed for everything going on the desk, and the 80x30 door was perfect for this. Also cable management baskets, thank you wonderful cable management baskets. They worked brilliantly, and really helped with all the wiring. At this point I thought I was finished with the build, but never being one to let things be new ideas would see a few more additions to the desk over the next few months.